Back to Article

Distributed Generation and Optimization of smart Grid Systems: Case Study of Kumba in Cameroon

World Journal of Electrical and Electronic Engineering | Vol 1, Issue 1

Table 1. Load Point Output Without DG

ComponentAverage interruption rateAverage outage durationAnnual outage duration
IDf/yrhrhr/yr
Feeder 121.675.5669.19
Feeder breaker 1121.670.5060.84
Feeder breaker 2121.671.0121.67